ÁREA PRIVADA

   

C/ Antonio Belmonte Abellán
30.100 Murcia, SPAIN
Tlf.: +34 968 307 250
Fax: +34 968 305 432
E-mail: info@probeltebiotecnologia.es

Skip Navigation LinksBIOTECHNOLOGY > Plant

In Probeltebio, we have a new production plant building, designed with the most advanced technologies and integrated control systems. The new factory has been built on a plot of 2.5 ha. at La Polvorista Technology Park, Molina de Segura, Murcia, of which 4000 sq m are already built and another 2000 sq m correspond to a semi-covered area for storage and supply of raw material. 

The factory has been designed adopting the highest standards of quality of the equipment, facilities and processes (pharmaceutical standards) expected to achieve the GMP certification and the validation of the plant under the FDA criteria. The design, which includes an analysis of critical control points (HACCP), including the total physical separation in three process's areas: a preparation of extracts area, a standardisation area, and a finishing and packaging area for the final product.

On the other hand, the respect for the environment and safety in all aspects have been some of the main elements in the plant design, applying the highest standards of environmental control, enjoying the most advanced and effective control techniques.

Our processes include a rigorous quality control process that starts in the crops that provides the raw materials for our process; our fruit supply is controlled before the harvest, with our technical staff responsible for ensuring the quality of the crop, and to ensure that plantations have been grown following the recommendations of integrated productions.

The plant has a comprehensive system of quality control analysis from the fruit at its source through the different stages until the final product.